Machining Factory
Machining Factory — XRF at the door and auditable material control in Dongguan, China. Tolerances: ±0.003 mm milling, ±0.002 mm turning — ISO 9001 / IATF 16949 verified.
A machining factory is audited at three points: incoming material, traceability and the quality lab.
What is a machining factory?
A machining factory is a facility that machines parts, and the buyer's question is whether its controls are real: material control at the door, traceability through the floor, a quality lab that measures rather than trusts. This Dongguan factory answers those questions with XRF at incoming inspection and IATF 16949:2016.
A tolerance on a brochure is free; a tolerance that survives inspection is what you are buying. So the audit question is not "what tolerances do you hold" but "show me the measurement that proves it." Ask for a CMM report or an SPC chart from a real job, not a capability statement, and look for the number behind the claim.
This factory holds ±0.003 mm on CNC milling, ±0.002 mm on CNC turning and ±0.002 mm for precision grinding, and it backs the claim with process capability rather than just its word. On a representative length characteristic of 76.1–76.5 mm, the SPC record shows Cpk = 1.851 (one characteristic on one part, not a blanket capability claim) against an initial-study target of Ppk ≥ 1.67 — a measured result, not an assertion. If your print calls out a dimension the shop cannot reliably hold, the audit is where it says so, before cutting, not after.
Check the tolerance band first. Cpk is simply the band divided by the process spread, so it is relative — never an absolute accuracy score. The example here used a 0.4 mm band (76.1–76.5 mm) and held Cpk 1.851, deliberately wide. Put that same spread on a ±0.005 mm dimension and it would not pass. Demand the band, the sample size and the time window behind every capability figure.
Before you read the Cpk number, understand the tolerance language on the print. When a drawing calls out a general tolerance class instead of a dimension-by-dimension limit, it is invoking a standard that tells you what "unmarked" means.
| Print call-out | Meaning | What it allows on a 6–30 mm feature |
|---|---|---|
| ISO 2768-f | Fine general tolerance | ±0.1 mm |
| ISO 2768-m | Medium (common default) | ±0.2 mm |
| ISO 2768-c | Coarse general tolerance | ±0.5 mm |
| Explicit ±0.003 mm (milling) / ±0.002 mm (turning) | Shop-specific tight call-out | Must be proven by CMM report or SPC, not a brochure line |
A print that carries ISO 2768-m as a blanket call-out is asking for ±0.2 mm on a 6–30 mm feature — which a competent shop holds easily — while a single ±0.003 mm (milling) / ±0.002 mm (turning) call-out is a different order of difficulty and a different cost driver. The tolerance-price ladder below is qualitative, but the direction is the same in every shop: tighter tolerances move the part from standard cutting to dedicated fixtures, slower feeds, and finally to a ground finish.
| Tolerance band | Typical process | Relative cost driver |
|---|---|---|
| ±0.1 mm | Standard milling / turning | Baseline |
| ±0.05 mm | Careful setup, light cuts | Higher |
| ±0.02 mm | Dedicated fixtures, slower feeds | Significantly higher |
| ±0.003 mm (milling) / ±0.002 mm (turning) | Ground or finish-pass work, CMM-verified | Much higher, often moves the feature to grinding |
The Cpk number is the check most buyers skip and most suppliers cannot fake, because it is built from measured subgroups over a run, not from one lucky part. As a rule of thumb, Cpk 1.33 corresponds to a process running roughly four standard deviations inside the tolerance band, Cpk 1.67 to five, and Cpk 2.0 to six. When a supplier quotes Cpk = 1.851 (one characteristic on one part, not a blanket capability claim), ask for the subgroups, not just the headline — a real chart has a measured mean and range, while a made-up one has only the number.
Surface finish is the tolerance's twin, because a dimension can be right while the surface is wrong for the job. The print usually calls surface roughness as an Ra value in micrometres, and each band maps to a process and a purpose.
| Ra value | Typical process | Typical use |
|---|---|---|
| Ra 0.4 µm and finer | Lapping, honing, polishing | Sealing faces, optical surfaces, high-load sliding |
| Ra 0.8 µm | Precision grinding, fine turning | Bearing seats, sealing faces |
| Ra 1.6 µm | Standard machined finish | Default for most functional surfaces |
| Ra 3.2 µm | Coarse machined finish | Non-critical and cosmetic surfaces, pre-coating |
The Ra number is not a decorative detail; it is a functional requirement. A bearing seat or a sealing face at Ra 0.8 µm is a ground surface, while the same feature at Ra 3.2 µm is a turned or milled surface that may leak or gall. When a shop quotes without asking what Ra you need, it is treating a functional call-out as a cosmetic one, which is its own red flag, and the audit should treat it that way.
How do you audit incoming material control?
The most expensive defect in machining is not a dimensional miss; it is a perfect part made from the wrong material. That failure is silent until it is in your assembly, and it is prevented at one place only — the door, before the raw bar ever reaches a machine. So the audit question is a single one: what happens to incoming material?
The answer you want is a verification step, not a storage shelf. This factory checks every incoming lot by XRF against its mill certificate, so a mixed or mislabeled alloy is caught before cutting rather than discovered in your failure analysis. Combined with lot-level traceability, that means the material in the part can be traced back to the certificate that arrived with it, which is exactly what an automotive or regulated buyer's auditor is checking for.
The material question is the half of the audit most buyers skip, because a wrong alloy looks identical to a right one until it fails. The audit closes that gap by naming the material and asking how the shop proves it, and the right material differs by what the part must do.
| Alloy | Where it earns its place | Machining note | Audit question |
|---|---|---|---|
| 6061-T6 aluminum | General purpose, anodizes well, weldable | Free-cutting and fast | Is the temper called out on the print? |
| 7075-T6 aluminum | Strength-critical and aerospace parts | Nearly double 6061 strength, lower corrosion resistance | Does the shop know 7075 machines slower? |
| 5052 aluminum | Corrosion resistance, sheet and enclosure work | Soft and formable | Is 5052 chosen for formability, not strength? |
| 304 stainless steel | General corrosion resistance | Work-hardens, wears tools | Is passivation specified after cutting? |
| 316 stainless steel | Chloride and marine corrosion | Molybdenum makes it harder on tools | Why 316 rather than 304? |
| 4140 alloy steel | Shafts, gears, high strength after heat treat | Hardenable chromium-molybdenum steel | What heat-treatment state does the print call? |
The alloy table is not a menu; it is a set of questions. When you hand a drawing to a shop and it comes back asking which temper of 6061 you want, or flagging that 7075 machines slower and may cost more, you are talking to a machinist. When it quotes without asking, the material risk is being priced into your quote by someone who has not read the print.
Engineering plastics sit at the edge of the same audit, and the questions do not change just because the bar is a polymer. PEEK, PTFE, POM and nylon are machined here as insulators, wear parts and prototypes, and the material control stays the same: a lot arrives, its certificate is checked against what was ordered, and the lot number links into the same traceability chain as the metal next to it. A mislabeled plastic is caught by the same door check, because the costliest defect — a perfect part from the wrong material — is material-agnostic.
How do you audit traceability?
Traceability is the answer to one question: if a part fails, can the factory tell you why, and which other parts are affected? A factory without it can only guess; a factory with it can isolate the impact to a lot, a machine and an operator. The audit checks whether that chain is recorded or just claimed.
This factory runs an MES/ERP system that records the full chain on every lot: raw material source and usage, process parameters, machine data, production batch, machining time, operator and inspection results. If a non-conformance surfaces, the answer is specific — which lot, which machine, which operator — not a shrug. That is the discipline IATF 16949 audits look for, and it runs on every job, not just the automotive ones.
The chain is only as strong as its weakest hand-off, and each link is a place where a record can silently break. Read it link by link:
- Raw material — the lot number on the bar matches the mill certificate that arrived with it.
- Receiving — the XRF read is recorded against the same lot, not a generic "checked" note.
- Machining — the process, machine, program and operator are recorded for that lot, not the shift average.
- Inspection — the CMM or SPC result attaches to the lot, with measured values rather than a pass/fail flag.
- Secondary operations — outsourced finishing still appears in the chain, with the partner named.
- Shipping — the lot number survives into the packing and the documents that travel with the parts.
The speed test is the cheapest traceability check there is. Ask for the record on a specific lot while you are still on the call. A real MES/ERP system returns it in seconds because the record was written as the work happened; a system described in general terms returns nothing, or returns a spreadsheet assembled after the fact. Assembled-after-the-fact is not traceability, and it will not survive the follow-up question about which machine ran which operation.
What breaks traceability is not missing software; it is missing hand-offs. A lot that is split without re-linking, a reworked part that re-enters the line under a new number, an outsourced finish that returns without its partner record — each is a place where the chain quietly parts and the story stops being tellable. The audit probes exactly those seams, because that is where a factory that "has traceability" in the brochure turns out to have it only in the brochure.
How do you audit the quality lab on the floor?
The inspection bench is the part of the factory that checks the rest of it, so it is audited first. The question is not whether the lab looks clean; it is whether the instruments are the right class for the tolerances the shop claims, and whether they are calibrated on a schedule you can see.
- Hexagon GLOBAL S CMMs (2) for dimensional verification, plus a gear measuring center and vision measuring machines.
- KEYENCE VK-X3000 laser microscope and SURFCOM 1800D for surface finish and profile.
- XRF (iCHEQ) spectrometer for incoming material composition against the mill certificate.
- HVS-1000A micro-Vickers hardness tester, Fischer coating thickness gauge, salt spray and tensile testers.
The right way to read that bench is against the claims it must verify — an instrument only counts if it maps to a tolerance the shop advertises.
| What it measures | Instrument | Which claim it verifies |
|---|---|---|
| Dimensions | Hexagon GLOBAL S CMMs (2)±0.003 mm milling / ±0.002 mm turning, ±0.002 mm grinding | |
| Surface finish and profile | KEYENCE VK-X3000, SURFCOM 1800D | Ra call-outs on sealing and bearing surfaces |
| Material chemistry | XRF (iCHEQ) spectrometer | Incoming alloy against the mill certificate |
| Hardness | HVS-1000A micro-Vickers | Heat-treatment state after hardening |
| Coating thickness | Fischer gauge | Plating and anodizing specification |
Then look at the calibration stickers. Every instrument above carries a calibration date, and the date has to be current, not expired, because an uncalibrated CMM produces numbers that look precise and are wrong, and a wrong number is worse than no number because it is confident. A lab with the right instruments and current calibration converts a tolerance from a claim into a measurement; a lab that is clean because it is rarely used is a warning sign, not a virtue.
How do you audit secondary operations?

Most machined parts do not end at the last cut — they get anodized, plated, heat treated or deburred. Who does that work is an audit question, because finishing is frequently a separate facility with its own lead time and its own quality record. The answer you want is a named partner, not a vague "we handle everything."
This factory bundles finishing through qualified partners and says so plainly: surface treatments including anodizing, plating, powder coating and painting, and heat treatment including vacuum, bright, carburizing and nitriding. In-house ovens reach 500 °C, covering aluminum and low-temperature steel stress relief; titanium stress relief above that is outsourced and stated as such. Honesty about who does what is itself an audit finding, and a good one.
| Secondary process | What it does | Audit note |
|---|---|---|
| Anodizing | Builds an aluminum oxide layer, dyed or clear | Confirm the type — Type II decorative vs Type III hardcoat |
| Plating | Zinc, nickel or chrome for corrosion and wear | Confirm the spec thickness, not just the color |
| Powder coating | Polymer film for cosmetics and protection | Confirm masking of threads and toleranced bores |
| Heat treatment | Vacuum, bright, carburizing, nitriding | In-house to 500 °C; titanium stress relief above is outsourced |
The audit does not fail a factory for naming a dependency; it fails a factory for hiding one. Every shop sits at the center of a web of finishing partners, and the honest answer is "this runs through a partner we have qualified." The dishonest answer is silence until the part comes back wrong. Close the loop the same way as the other checks: ask for a real example — a part that ran through the anodizing partner, with the partner's record still visible in the chain.
What do supplier tiers and the contract-manufacturing boundary tell you?

Every supplier sits somewhere in a chain, and its tier describes who its customer is and what responsibility it carries. A tier-one supplier sells a finished assembly to an OEM and owns design or system responsibility; a tier-two or tier-three supplier machines parts or sub-assemblies to someone else's print. The tier is not a grade — it is a description of where the shop's responsibility begins and ends, and the audit exists to make that boundary explicit rather than assumed.
The boundary that matters most in machining is between build-to-print and design-own. A build-to-print shop machines your drawing exactly as drawn and takes no design credit; a design-own shop carries engineering responsibility for the part it ships. Neither is better, but a shop that is honest about which one it is, is far easier to audit than a shop that quietly claims both. This factory is build-to-print: its IATF 16949 scope excludes product design under Clause 8.3, and it states that plainly instead of over-promising.
For you, the boundary changes the audit question. With a build-to-print shop the drawing is the contract, and every downstream check is measured against it: "show me the part against my print, with the record." With a design-own shop the audit shifts to design controls, change management and validation evidence. When you know which shop you are talking to, you know which questions to ask, and a shop that answers "which one are you" without hedging is already passing its first honesty check.
How does the audit change across industries?
The evidence is the same, but the weighting shifts by what the parts must do. An automotive buyer, a medical buyer and a robotics buyer all run the same checklist, yet each stops to look harder at a different line of it, because each industry fails in a different way when machining goes wrong.
- Automotive weights process control and documentation: PPAP, SPC, PFMEA, and a traceability record that survives a recall. The tolerance question becomes "show me the control plan, not just the chart."
- Medical weights material traceability and cleanliness: the alloy, its certificate and its lot history, plus surface finish and freedom from contamination. The material question becomes the first question, not the fifth.
- Robotics and automation weight geometric repeatability across volume: the same part, thousands of times, within tolerance. The machine-list question becomes "how many machines run this, and how consistently."
- Electronics and semiconductor weight surface finish, flatness and cleanliness on small, precise features, where a burr or a scratch is a rejection, not a cosmetic note.
The same Cpk chart reads differently in each of those rooms. An automotive buyer reads Ppk ≥ 1.67 at the initial study on key characteristics as "this characteristic will stay inside the tolerance for the life of the run"; a medical buyer reads it as "this dimension, on this material lot, is documented well enough to defend in an audit"; a robotics buyer reads it as "this part will repeat across thousands of units." One chart, three questions, and the audit's job is to make sure the shop can answer the one your industry is asking, not just the one it likes to answer.
The useful audit insight is that a factory which serves the most demanding of these industries has already been forced into the discipline the others want. Automotive-grade process control — SPC, PPAP and PFMEA — runs on every job on this floor, not only the automotive ones, because it is cheaper to run one disciplined system than two. When you audit a shop that supplies automotive or medical work, you are auditing the discipline that industry demanded, and that is the discipline your parts inherit.
What DFM questions reveal whether the supplier protects you or just quotes you?
A design-for-manufacturing review is the quiet part of the audit, and it separates a manufacturer from a quote machine faster than any document. The manufacturer reads your print for what could fail and tells you before the order; the trading desk reads it for what it can bill and stays silent. Ask these questions and listen for the difference.
- Thin walls — a wall that is too thin for stable cutting will chatter or warp. A manufacturer asks whether the wall can be thickened or ribbed; a relay quotes it as drawn.
- Deep holes — a hole deeper than about four diameters needs pecking or gun drilling and runs slower. A manufacturer says so; a relay prices it as a standard hole.
- Internal radii — a cutting tool is round, so an internal corner has a radius equal to the tool. A small radius means a small tool, slower cutting and more chatter. A manufacturer asks for the largest radius the design allows.
- Thread depth — a blind tapped hole needs about 1.5 diameters of thread depth to develop full strength. A manufacturer flags a shallow call-out; a relay taps what is drawn.
- Over-tolerancing — every tight call-out on a non-functional surface adds cost without adding function. A manufacturer asks which tolerances are functional; a relay prices every one at the tight end.
The red-team view is the same exercise turned on the supplier. When does this sourcing decision fail? It fails when the shop quotes without reading the print, when it holds a tolerance on paper it cannot hold on a CMM, when it hides the secondary operation that will add two weeks and a new quality record, and when the material that arrives is not the material on the certificate. Each of these has a specific audit counter — a DFM question, a measurement demand, a named partner, a lot-level check — which is why the checklist exists in the first place.
What is CNC machining factory?
A CNC machining factory is a manufacturing facility that operates computer-numerically-controlled milling, turning, and grinding equipment to produce parts against a customer drawing. The factory's scope is broader than a job shop: it runs end-to-end from raw material (bar stock, plate, cast blank) through machining, surface treatment, inspection, packaging, and export, with the certifications (ISO 9001 / IATF 16949 / ISO 14001) that support export to U.S., EU, and Asian automotive and industrial buyers.
The discipline at factory scale separates into milling lines (3-axis, 4-axis, 5-axis machining centres), turning lines (CNC lathes and Swiss-type lathes with bar feed), and finishing lines (precision surface grinding, cylindrical grinding, wire EDM, anodising, powder coat, plating). A factory is distinguished from a job shop by integrated quality systems (calibration, SPC, MSA, PPAP, IMDS) and by the certifications that allow direct shipment to automotive and aerospace buyers.
The output of a CNC machining factory is a part that meets the drawing — geometry, tolerance, surface finish, and material certificate — and is documented to a quality plan (FAI, PPAP, IMDS) plus the export paperwork (Certificate of Origin, mill certificate, REACH/RoHS declarations). That is the answer to "what is a CNC machining factory": an integrated manufacturing facility that runs CNC machining end-to-end, with the certifications and documentation that let the part land in the destination country.
How do you read a machining quote like an auditor?
A quote is the first document the audit reaches after the brochure, and it is read the same way: every line has to become evidence. A real machining quote names the material with its grade and temper, the process and machine family, the tolerance it will hold, the surface finish it assumes, the finishing and heat treatment, the inspection, and the lead-time tier, and it flags any tolerance or DFM issue it found while reading your print. A vague quote that says "machined part, delivered" with a single lump sum is the brochure wearing a different hat.
The breakdown is the tell. A manufacturer can separate material from setup from cycle time from finishing from inspection, because those are real cost buckets it manages every day; a trading desk cannot, because it is reselling someone else's number. Ask for the breakdown and watch what comes back.
- Material line — names the alloy, grade and temper, not just "aluminum" or "steel."
- Process line — names the machine family and the axis count, not "CNC machining."
- Tolerance line — states the tolerance it will hold and how it will be verified, not "tight tolerance."
- Finishing line — names anodizing, plating, coating or heat treatment, and whether it is in-house or through a named partner.
- Inspection line — states whether a CMM report or SPC chart ships with the parts, and for which characteristics.
The quote is also where the DFM findings surface, or fail to. A shop that quotes your print without a single question about a thin wall, a deep hole or a tight tolerance has not read the print — it has priced it. The quote that comes back with two questions and a flag is the quote from a shop that intends to make your part, not just win your order.
What commercial and shipping terms does the audit cover?
The commercial terms are the last part of the audit, and they define where the supplier's responsibility ends and yours begins. The same part can be quoted under different Incoterms, and each one moves a different risk onto your account. EXW (Ex Works) means the goods are made available at the factory gate and you carry everything from there; FOB (Free On Board) means the seller clears export and the risk passes when the goods are on board the vessel; CIF (Cost, Insurance and Freight) adds freight and insurance to the named port; DDP (Delivered Duty Paid) means the seller delivers with duties cleared to your door. Each term is a line in the audit, not a footnote.
None of these terms changes the evidence questions — the machine list, the tolerance proof, the material record and the traceability are the same regardless of who books the vessel. What the terms change is the risk transfer, and the audit should record which term is quoted so that the price is compared on the same basis. Two quotes at the same number but different Incoterms are not the same offer, and if you compare them without noting the term, you are comparing prices that were never like for like.
What red flags end an audit early?
Most audits fail on a handful of recurring signs, and they show up early if you are looking for them. These are the items that should stop you before the first order, not after it.
- A machine list that will not name models. A factory names machines; a broker names categories.
- A tolerance claim with no measurement behind it. If there is no CMM report or SPC chart, the number is a wish.
- A certificate with no verifiable number. Real certificates have numbers you can check with the registrar.
- Secondary operations with no named owner. Outsourced finishing is fine; hidden finishing is not.
- A material answer without a lot link. A mill certificate that is not tied to the bar in front of you is a receipt, not a record.
- A refusal to show the floor. A shop that will not do a video walkthrough or an audit has something to hide.
Each of these fails for the same reason: a claim that refuses to become evidence. The factory that passes hands you every item on the list in writing; the one that fails stalls on a single item, and the stall is the finding. Send a drawing to [email protected] and this factory will run its own checklist on itself for you — the machine list, the tolerance evidence, the material control and the traceability — in writing, before you commit.
Guides
- Machining factory lead times — what drives the 3-day, 7-day and 30-day tiers, and how to plan prototypes, batches and reorders around the factory queue.
- Machining factory cost in 2026 — your cost model where the floor audit sets the price.
What this shop actually runs
A buyer asking for capability evidence should get a specific answer. The facility behind this guide operates 100+ CNC machines across a 6,800 m2 plant in Dongguan, China, with 100+ staff. The machine list by category:
- 5-axis machining centres (10+) - Mazak VARIAXIS I-600 (510/910/510 mm travel, 12,000 rpm, 22 kW, 71.6 N·m, 30-tool BT40) and Mazak INTEGREX I-250H S (B-axis 0.0001°, 24 kW, 124 N·m, 38-tool HSK-A63). Cut on compound-angle parts, single-setup multi-face prismatic work, and aerospace fittings where datum transfer loss is unacceptable.
- 3-axis / 4-axis machining centres (50+) - Brother SPEEDIO S500Z2N / S700Z2N (10,000 rpm, 14/21-tool ATC, 0.7 s tool-to-tool, Z-axis 2.2 G) and Mazak VCE-430A L / VCE-570C L (10,000 rpm, 118 N·m, 24-tool ATC). Cut on prismatic parts, plates, brackets, housings.
- Over 100 machines on one floor — Mazak / Brother / Tsugami / Star / Citizen class across 6,800 m², with 50+ 3-axis, 20+ 4-axis, 20+ 5-axis, 25+ lathes, 7+ grinders and 20+ inspection instruments.
- Measured, not claimed: ±0.002 mm, verified on Hexagon CMMs. Per-characteristic capability is Ppk ≥ 1.67 initial and Cpk ≥ 1.33 production (≥ 1.33 general). Reports name the feature, band, sample size, sigma method and window.
- Certified under ISO 9001:2015, IATF 16949:2016 (design excluded) and ISO 14001:2015 — Dongguan Zhuohang Ltd is the invoicing entity behind them.
- Order terms: a one-piece minimum and lead times around 3, 7 or 30 days, set by part complexity.
- Machine highlights - VARIAXIS I-600: one-setup multi-face 5-axis + MAZA-CHECK auto-calibration; INTEGREX I-250H S: DONE-IN-ONE mill-turn, B-axis 0.0001° + Ai thermal shield; SPEEDIO S500Z2N / S700Z2N: Z-axis 2.2 G + 0.7 s ATC; Swiss-type: guide-bush switchable + 0.1 µm resolution.
Tolerance bands held: ±0.003 mm on CNC milling, ±0.002 mm on CNC turning, ±0.002 mm on precision grinding and wire EDM. Capability indices: Ppk >= 1.67 initial on key characteristics; Cpk >= 1.33 ongoing in production.
Certifications: ISO 9001:2015 (116024/A/0001/UK/En), IATF 16949:2016 (131941/A/0001/SM/En, design clause 8.3 excluded - disclosed openly), ISO 14001:2015 (116024/B/0001/UK/En). Certificates are issued to Dongguan Zhuohang Ltd (USCC 91441900MA4UWT6X39, established 2005).
Service area: Austria, Belgium, the Czech Republic, Denmark, France, Germany, Greece, Hungary, Ireland, Italy, the Netherlands, Spain, Sweden and the United Kingdom in Europe; Brazil, Canada, Mexico and the United States in the Americas; China, Israel, Japan, Singapore and Sri Lanka in Asia; Australia and New Zealand in Oceania; and South Africa in Africa. Based in China, serving customers worldwide.
Contact: Felipe Iglesias, [email protected], +86 13126536955.
Run the audit checklist on this factory
Send your drawing to [email protected] or call +86 13126536955 — machine list, tolerance evidence and material control in writing.
Frequently Asked Questions
Why audit a machining supplier instead of trusting the brochure?
In short, Because every supplier claims to be capable, and the claim is cheap. An audit turns the claim into evidence: a document you can read, a machine you can see running, a measurement you can check.
What documents should I request before an audit?
In short, The machine list with model names and counts, calibration records for the inspection instruments, SPC or CMM reports from a real job, the certificate numbers with registrar and scope, a sample PPAP or control plan, material mill certificates, the incoming inspection log, and a named contact for secondary operations. A real factory produces these on request; a trading desk cannot.
How do I verify the machine list is real?
In short, Ask for model names and quantities, not a category name, then match them to what is on the floor. A manufacturer can say which machines run which parts; a trading company recycles brochure photos.
How do I verify the tolerance claim?
In short, Ask for a CMM report or SPC chart from a real job, not a capability statement. This factory holds ±0.003 mm on CNC milling, ±0.002 mm on CNC turning and ±0.002 mm for grinding, and on a representative 76.1–76.5 mm characteristic its SPC shows Cpk = 1.851 (one characteristic on one part, not a blanket capability claim) against an initial-study target of Ppk ≥ 1.67.
What is the MOQ and lead time for machining?
The MOQ is 1 piece, so you can audit a first article before committing to volume. Lead time is roughly 3, 7 or 30 days depending on part complexity and the number of process steps, with surface finishing pushing a part into the longer 30-day tier.
Are the certifications verifiable with the registrar?
In short, Yes. ISO 9001:2015 is certificate 116024/A/0001/UK/En, IATF 16949:2016 is 131941/A/0001/SM/En, and ISO 14001:2015 is 116024/B/0001/UK/En, all issued by URS.
How do I audit incoming material control?
In short, Ask how material is verified at the door. This factory checks every incoming lot by XRF against the mill certificate before it reaches a machine, so mixed or mislabeled alloy is caught up front.
What do supplier tiers and the contract-manufacturing boundary tell me?
In short, The tier describes where the shop sits in the chain — who its customer is and what responsibility it carries. This factory is build-to-print: its IATF 16949 scope excludes product design under Clause 8.3, so it machines to your drawing and takes no design credit.
How does the audit change by industry?
In short, The evidence is the same, but the weighting shifts. Automotive and medical buyers weight traceability and process control (PPAP, SPC, PFMEA); robotics buyers weight geometric repeatability across volumes; electronics and semiconductor buyers weight cleanliness and surface finish.
What DFM questions should I ask during the audit?
In short, Ask how the supplier would handle thin walls, deep holes, small internal radii and over-toleranced prints. A manufacturer flags a wall that is too thin for stable cutting and a hole deeper than four diameters; a trading desk quotes it without comment.
What does a complete audit report contain?
In short, A machine list with makes and counts, the certificate numbers with scopes, a CMM report or SPC chart from a real job, the traceability record on a specific lot, a calibration record for the inspection bench, and a live or recorded floor walk. Each item answers one question, and together they are the evidence that the supplier is a manufacturer rather than a story.
How do I arrange an audit or a video walkthrough?
In short, Email [email protected] or call +86 13126536955. A live video walkthrough of the floor is available on request — machines running, inspection area, and the material check at the door — so the first visit needs no plane ticket, and an in-person audit can be scheduled the same way.
Do you use MIL-STD-105E or ANSI/ASQ Z1.4 sampling inspection?
In short, MIL-STD-105E is the U.S. military sampling inspection standard published in 1989; it specifies acceptable quality limit (AQL) sampling plans for lot-by-lot inspection.
Standards referenced on this page
- ASTM B211/B211M-19 — Standard Specification for Aluminum-Alloy Rolled or Cold Finished Bar, Rod, and Wire
- ASTM A276/A276M-17 — Standard Specification for Stainless Steel Bars and Shapes
- IATF 16949:2016 — Automotive quality management system standard